You are here:

Visits & Practical Workshops

Wood Industries

For Governments, Ministries

Citycouncils

District Heating Plants

Choice of System Size

Plant Technology

Wood Chip Storage

Handling of Fuel

Feeding Systems

Combustion Chamber and Boiler

Combustion Quality

Chimney

Handling of Ash

Fire Protection

Control, Adjustment,and Supervision

Plant Manpower

For Investors, Banking, Capital

Farmers

Videoschool

Biogasplants

Wood Gasification Boilers 15 kW to 2.000 kW

Straw Gasification Boilers 100 kW to 20.000 kW

Wood chip Boilers 30 kW to 10.000 kW

Pellet Boilers and Pellet Plants

Solar Cooling

Solar Heating

Solar Power

Combined Heat a. Power Generators 5 kW to 5MW

Gas Absorption Heating Pumps

Direct Fired Gas Absorption Chillers

Search for:

Common:

Home

When firing with forest wood chips, the risk of fire is lesser than by firing with dry fuels. However, certain safety regulations must be complied with.
The fuel system should be equipped with an airtight dividing wall, thereby preventing fire from spreading backwards from the combustion chamber to the storage.
At most plants, the feeding systems are designed with an airtight “plug” of wood chips and a sprinkler system located just before the combustion chamber.
Attention should be paid to the risk of flue gas explosions. Unburned gases in an incorrect mixture with atmospheric air may cause extremely violent explosions if gases, e.g. due to a positive pressure in the combustion chamber leaking into the boiler room or the feeding system. Flue gas explosions may also occur in the combustion chamber if, e.g. the fuel due to suspension of operations has been smouldering with too little atmospheric air,
and air is suddenly introduced.
In the wood chip storage one should beware of the risk of spontaneous combustion. Here storage height, wood chip storage time, moisture content, and the
access to air will be a decisive parameter.
During firing with wood pellets and dry wood waste, there is a risk of dust explosion in the storage and the feeding system. Here fire extinguishing equipment should be built in just before the boiler. The risk of fire in the fuel storage also applies to pellets.